首页> 外文期刊>International Journal of Product Development >A VSM and VSA methodology for performance assessment of complex product manufacturing processes: an industrial case study
【24h】

A VSM and VSA methodology for performance assessment of complex product manufacturing processes: an industrial case study

机译:用于复杂产品制造过程的性能评估的VSM和VSA方法:工业案例研究

获取原文
获取原文并翻译 | 示例
           

摘要

This manuscript describes a Value Stream Mapping (VSM) based generic methodology that enables the visualisation, performance assessment (PA) and waste reduction (WR) in a Complex Products' Manufacturing Process (CPMP). The VSM, along with Kanban, enables modelling and implementing an order-driven or pull manufacturing process (MP) together with just-in-time material (or semi-finished items) arrivals. The methodology also incorporates a number arrays-based approach that enables a comprehensive Value Stream Analysis (VSA) when the value stream map (VSMap) becomes significantly large and complex. A case study has been performed in collaboration with a saw-blade sharpening machines' manufacturing firm to illustrate the use of the suggested VSM-based generic methodology and number arrays in VSA for PA of CPMPs. The calculated lead-time of the case study complex product (CP) is almost 323 days. All cycle times are smaller than takt time (TT) (i.e. 600 min).
机译:此稿件描述了一种基于价值流映射(VSM)的通用方法,其在复杂的产品“制造过程(CPMP)中实现了可视化,性能评估(PA)和废物减少(WR)。 VSM以及KANBAN,使得能够与即时材料(或半成品)到达一起建模和实现订单驱动或拉动制造过程(MP)。 该方法还包含基于数组的基于数组的方法,当值流映射(VSMAP)变得明显大而复杂时,可以实现全面的值流分析(VSA)。 已经与锯片磨削机器的制造公司合作进行了一个案例研究,以说明在VSA的VSA中使用所提出的VSM基通用方法和数阵列的使用。 案例研究复杂产品(CP)的计算的延期时间差不多323天。 所有循环时间都小于TAGT时间(TT)(即600分钟)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号