...
首页> 外文期刊>International journal of ecohydrology and hydrobiology >Restoring the perennial Great Ruaha River using ecohydrology, engineering and governance methods in Tanzania
【24h】

Restoring the perennial Great Ruaha River using ecohydrology, engineering and governance methods in Tanzania

机译:使用坦桑尼亚的生态学,工程和治理方法恢复常年伟大的Ruaha河

获取原文
获取原文并翻译 | 示例
           

摘要

The Great Ruaha River (GRR) in Tanzania was perennial before 1993. Its source, the Usangu wetlands, was also perennial. Since then, the GRR has started drying out during the dry season, with a trend towards earlier and longer periods of drying. This drying process degrades the surrounding ecosystems along the entire length of the GRR, including the Ruaha National Park (RNP) and impacts human livelihoods throughout its course; it also impairs the economy of Tanzania through reduced hydropower generation at the Mtera and Kidatu power plants. The Usangu wetlands dried up in 2000, 2002 and 2005 during the dry season and its areal extent has been shrinking. Intensive livestock grazing and both dry and wet season irrigated agriculture in the Usangu wetlands, were the main reasons for this water crisis. In 2006, the Government of Tanzania moved to address the crisis by removing livestock from the Usangu wetlands, attempting to regulate water use in the GRR catchment and expanding the RNP to include the Usangu wetlands.
机译:坦桑尼亚的伟大Ruaha River(Grr)在1993年之前是多年生的。它的来源是Usangu湿地也是多年生的。从那时起,GRR在干燥的季节开始干燥,趋势趋势较早,干燥时期。这种干燥过程沿着GRR的整个长度降低了周围的生态系统,包括Ruaha国家公园(RNP),并在整个课程中影响人类生计;它还通过降低的水电站在MTERA和Kidatu发电厂中损害了坦桑尼亚的经济。在旱季期间,2000年,2002年和2005年的Usangu湿地在旱季干涸,其面积萎缩。在Usangu湿地中,密集的牲畜放牧和干湿季节灌溉农业,是这种水危机的主要原因。 2006年,坦桑尼亚政府通过从Usangu湿地移除牲畜,试图调节GRR集水区的用水并扩大RNP,包括USGU湿地。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号