首页> 外文期刊>Industrial Technology >Novel upgrade solution for historic London landmark
【24h】

Novel upgrade solution for historic London landmark

机译:历史悠久的伦敦地标的小说升级解决方案

获取原文
获取原文并翻译 | 示例
           

摘要

A gearbox lubrication upgrade at Tower Bridge is ensuring reliable operation during the winter months when the bridge's bascule raise mechanical drives are operated only intermittently A feat of 19th Century engineering, Tower Bridge is one of London's favourite icons. Under the Corporation of London (Tower Bridge) Act 1885, the Bridge is required to be raised to provide access to and egress from the Upper Pool of London, day and night, 365 days a year. The Bridge is raised around 800 times per annum.
机译:在塔架桥梁升级升级升级在冬季几个月内的可靠运行时,当桥梁的猛增机动力仅在19世纪工程的壮举中运营时,塔桥是伦敦最喜欢的图标之一。 根据伦敦(塔桥)法案1885年,该桥必须提出,以便每年365天的365天从伦敦,日夜获得访问和出口。 这座桥梁每年左右800次升起。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号