Prilling Tower Inner Side Epoxy Work - KFL, Shahjahanpur

机译:Prilling塔内侧环氧工作 - Kfl,Shahjahanpur

获取原文
获取原文并翻译 | 示例
           

摘要

Prilling tower in urea plant was constructed in the year 1994. Epoxy coating was provided to inner side of the prilling tower to protect it against urea. It was taken into operation on 23rd November 1995. Since then, it has been producing urea in the form of prills. On inspection, it was found that the epoxy coating inside of prilling tower was eroded or peeled off at few places which could result in seepage of urea to the RCC structure and weaken the tower. So it was decided to take proper action to get it rectified by providing epoxy coating on the inner surface during the annual turnaround 2017-18. It took 20 days to complete the job. The article describes the experience of epoxy coating on the entire area of prilling tower (about 9000 m~2) without any incident.
机译:尿素厂的PRILLING TOWER于1994年建造。环氧涂层提供给PRILLING塔的内侧,以保护其免受尿素。 它于1995年11月23日开始运作。从那时起,它一直在生产鼠李形式的尿素。 在检查时,发现在少数地方侵蚀或剥离梅花塔内的环氧涂层,这可能导致尿素渗流到RCC结构并削弱塔。 因此,决定采取适当的行动,通过在年度周转2017-18期间在内表面上提供环氧树脂涂层来纠正。 完成工作需要20天。 本文介绍了普拉明塔整个区域(约9000 m〜2)的环氧涂层的经验,没有任何事件。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号