首页> 外文期刊>Africa oil and gas: Breaking news and analysis from Africa >FPSO demand to continue to rise with capacity limited
【24h】

FPSO demand to continue to rise with capacity limited

机译:FPSO要求继续与容量有限的升级

获取原文
获取原文并翻译 | 示例
           

摘要

Energy Maritime Associates (EMA) sees FPSO demand continuing to rise in the short to medium term although a number of units will remain idle and spare capacity is becoming limited. In its 2020-2024 floating production systems (FPS) outlook report analysis shows 19 contracts for floating production units were awarded in 2019. There were 11 FPSO orders in 2018 and seven in 2017.
机译:能源海事员工(EMA)认为FPSO需求继续在短期到中期上升,尽管许多单位将保持闲置,备用能力变得有限。 在其2020-2024浮动生产系统(FPS)展望报告分析中,2019年颁发了19次浮动生产单位合同。2018年有11个FPSO订单,2017年七。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号