...
首页> 外文期刊>TEX Energy Report >Latest Production Plan for Ovoot Early Development Project
【24h】

Latest Production Plan for Ovoot Early Development Project

机译:Ovoot早期开发项目的最新生产计划

获取原文
获取原文并翻译 | 示例
           

摘要

Aspire Mining Limited, Australia has recently made clear its latest coal production plan for Ovoot Early Develop-ment (OED) Project, a metallurgical coal project in Mongolia.According to this, the coal production period for OED Project is 14 years, and a total of 54 million tons of coal willbe produced during this period, the details of which are 1.0 million tons in the first year, 3.1 million tons in the second year,3.2 million tons in the third year, 3.7 million tons in the fourth year, 3.9 million tons in the fifth year, 4.2Mtpa in the sixth andseventh years, 4.6Mtpa in the eight to tenth years, 4.4 million tons in the eleventh year, 4.5 million tons in the twelfth year,4.8 million tons in the thirteenth year and 3.2 million tons in the fourteenth year.
机译:Aspire Mining Limited,澳大利亚最近明确了其最新的煤炭生产计划,即蒙古的冶金煤项目Ovoot早期开发(OED)项目。根据这一点,OED项目的煤炭生产期为14岁,而且 在此期间生产的5400万吨煤炭,其中细节是第一年的120万吨,第二年31万吨,三年三吨,第四年370万吨,3.9 五年级百万吨,4.2MTPA在第六岁,4.6MTPA在八到十年中,第十一年440万吨,第十三年450万吨,第十三年480万吨,320万吨 第十四年的吨。

著录项

  • 来源
    《TEX Energy Report》 |2019年第3888期|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 工业经济;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号