...
首页> 外文期刊>TEX Energy Report >Integration of United and Wambo Coal Mines to Be Completed in 2020
【24h】

Integration of United and Wambo Coal Mines to Be Completed in 2020

机译:融合联合和华美煤矿将于2020年完成

获取原文
获取原文并翻译 | 示例
           

摘要

United Wambo Integration Project driven jointly by Peabody Energy Corporation and Glencore plc is forecast tobe completed in the former half of 2020.United Wambo Integration Project aims to integrate Wambo open-cut coal mine in the Hunter Valley region in theState of NSW operated by Peabody Energy and United coal mine adjoining this coal mine operated by Glencore, anddevelop both coal mines as well as unexplored mining areas around both coal mines as a single entity. United Wambo coalmine will be born as a large-scale open-cut thermal coal mine by integrating both coal mines.
机译:Peabody Energy Corporation和Glencore PLC共同推动的美国联合沃博集成项目预计将在前一半的2020年完成。“一整体集成项目”旨在将彭博谷地区融合在南威尔士州的猎人谷地区,由Peabody Energy 和联合煤矿相邻的这款由Glencore运营的煤矿,并开发煤矿以及煤矿周围未开发的矿区作为单一实体。 通过整合煤矿,联合华博煤矿将作为大型开割热煤矿。

著录项

  • 来源
    《TEX Energy Report》 |2019年第3798期|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 工业经济;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号