...
首页> 外文期刊>TEX Energy Report >Corsa Coal Partially Revises Production Target by Coal Mine
【24h】

Corsa Coal Partially Revises Production Target by Coal Mine

机译:Corsa煤部分通过煤矿修改生产目标

获取原文
获取原文并翻译 | 示例
           

摘要

Corsa Coal Corp. developing the coal business in the U.S. has partially revised its targeted production volume ofmetallurgical coal by coal mine in 2019 this time.Corsa Coal is now running such 5 coal mines in the Northern Appalachian (NAPP) region as (1) Casselman coalmine, (2) Acosta coal mine, (3) Horning coal mine, (4) Hamer coal mine and (5) Schrock Run coal mine, of which (1) to(3) are an underground coal mine and (4) to (5) are an open-cut coal mine.
机译:Corsa Coal Corp.在2019年煤矿开发煤炭业务在2019年通过煤矿部分修改了其目标煤炭矿物质煤炭.Corsa煤炭现已在北阿巴拉契亚州(NAPP)地区为(1)Casselman(1)Casselman等5种煤矿 煤矿,(2)Acosta煤矿,(3)角煤矿,(4)哈默煤矿和(5)斯基罗克运行煤矿,其中(1)至(3)是地下煤矿和(4) (5)是一个开放式煤矿。

著录项

  • 来源
    《TEX Energy Report》 |2019年第3900期|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 工业经济;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号