首页> 外文期刊>Platt's Oilgram News >Equinor to drill new wells at delayed Norwegian gas field over safety concerns
【24h】

Equinor to drill new wells at delayed Norwegian gas field over safety concerns

机译:Equinor在延迟挪威气体领域钻探新井过度安全问题

获取原文
获取原文并翻译 | 示例
           

摘要

London-Norway's state-controlled Equinor said Sept. 8 it had opted to drill new gas wells at the major Martin Linge field in the Norwegian sector of the North Sea after analysis showed that wells drilled before it became operator in 2018 were “inappropriate” for safe production. Equinor took over in March 2018 as operator of Martin Linge from France's Total, which drilled four gas wells before the change in operators. “Equinor conducted an in-depth analysis of the wells drilled at Martin Linge before the company took over as the operator of the field from Total in 2018. This review concludes that several of the wells do not have the necessary barriers,” Equinor said in a statement. “Equinor, therefore, plans to drill new wells in order to ensure safe production,” it said.
机译:伦敦 - 挪威国家控制的居民表示9月8日,它选择在分析后在北海的挪威行业的主要Martin Linge领域钻探新的气井井,在2018年成为运营商之前钻井的井是“不合适” 安全生产。 EquInor于2018年3月接管了Martin Linge的总部,从法国的总部讲,在运营商的变化之前钻了四个气井。 “EquInor在2018年总共占据现场的运营商之前对Martin Linge钻井的井进行了深入的分析。这篇评论得出结论,其中几个井没有必要的障碍,”Equinor说 一份声明。 因此,“雄鹿”计划钻探新井,以确保安全生产,“它说。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号