...
首页> 外文期刊>Platts Metals Daily >Dongguashan Cu ore volume at 90k mt in first 10 days of Aug
【24h】

Dongguashan Cu ore volume at 90k mt in first 10 days of Aug

机译:东圭山铜矿卷在8月10日八千吨

获取原文
获取原文并翻译 | 示例
           

摘要

Chinese copper giant Tongling Nonferrous’ Dongguashan copper mine has processed more than 90,000 mt of ore in the first 10 days of August, the producer said in its weekly company report Aug. 19. In the whole of July, the mine processed 274,000 mt of copper ore, an historical peak, the producer’s data showed. The company said that the mine was shut in the first half of this year for an overhaul, and in the second half of the year, it was striving to compensate for the lost output.
机译:中国铜巨型铜陵无助的“东戈山铜矿在8月的前10天加工超过90,000吨矿石,该制片人于8月19日的每周报告所述。在7月份,矿井加工了274,000吨铜 矿石,历史峰值,生产者的数据显示。 该公司表示,矿井在今年上半年被关闭,以进行大修,并在今年下半年,努力弥补失落的产出。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号