...
首页> 外文期刊>SBB Steel Markets Daily >Nucor temporarily idles Louisiana DRI plant due to virus impacts
【24h】

Nucor temporarily idles Louisiana DRI plant due to virus impacts

机译:由于病毒的影响,Nucor暂时闲置路易斯安那州DRI植物

获取原文
获取原文并翻译 | 示例
           

摘要

Pittsburgh—Nucor has temporarily idled its Louisiana direct-reduced iron (DRI) facility due to impacts resulting from the coronavirus pandemic, a spokeswoman for the company said Monday. "With the state of Louisiana having been particularly hard hit by the Covid-19 outbreak and economic uncertainty nationwide, we have temporarily suspended operations at our Nucor Louisiana direct reduced iron plant," a Nucor spokeswoman said. "Our steel mills that use DRI as feedstock continue to operate and are utilizing existing DRI inventory."
机译:本公司周一表示的一位发言人,匹兹堡 - Nucor暂时禁止其路易斯安那州的直接减少铁(DRI)设施,这是由Coronavirus Pandemare造成的影响。 “随着科罗伊斯州的爆发和全国经济不确定性特别艰苦的路易斯安那州,我们暂时停止了我们的Nucor Louisiana直接缩减铁厂的行动,”Nucor发言人说。 “我们的钢厂使用DRI作为原料继续运行并利用现有的DRI库存。”

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号