...
首页> 外文期刊>SBB Steel Markets Daily >Spain's h1 interruptible auction outcome 'a tragedy': unesid
【24h】

Spain's h1 interruptible auction outcome 'a tragedy': unesid

机译:西班牙的H1中断拍卖结果'悲剧':Unesid

获取原文
获取原文并翻译 | 示例
           

摘要

Madrid—Spain has assigned the full amount of 1,000 MW of interruptible power contracts for the first half of 2020, with the price dropping to around one ninth of the previous sale, an outcome branded “a tragedy for Spain’s steel industry” by industry association Unesid. Grid operator Red Electrica de Espana (REE) announced Thursday a total of 200 blocks of 5-MW apiece were awarded in the sale in which 118 large users participated, with the outcome price of Eur8,765/MW, REE said, without revealing details about the winners.
机译:马德里 - 西班牙已在2020年上半年分配了全额1,000兆瓦的可中断电力合同,以前的价格下降至上一次销售,这是一个由工业协会的“西班牙钢铁行业悲剧”的成果突出 。 电网运营商Red Electra De Espana(REE)周四宣布共有200个街区5块5兆瓦的销售销售,其中118位大型用户参加,随着详情的情况下,成果价格为8,765美元/兆瓦,没有揭示细节 关于获奖者。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号