...
首页> 外文期刊>The TEX Report >Hunnu Coal Expects Coal Production Starting In Later Half 2011-Coal resources total at Tsant Uul concession 89,700,000 MT-
【24h】

Hunnu Coal Expects Coal Production Starting In Later Half 2011-Coal resources total at Tsant Uul concession 89,700,000 MT-

机译:匈奴煤炭公司预计将于2011年下半年开始生产煤炭-尚乌尔矿区的煤炭资源总量为89,700,000吨,

获取原文
获取原文并翻译 | 示例
           

摘要

Hunnu Coal Ltd. of Australia plans to start coal production at metallurgical coal project, Tsant Uul metallurgical coal project in Mongol in later half of 2011. Tsant Uul metallurgical coal project is to develop undeveloped metallurgical coal concession Tsant Uul concession in South Gobi Province and to export metallurgical coal and high quality thermal coal produced at the concession to China and other markets. Hunnu acquired 90 percent interest in the project in later May 2010.
机译:澳大利亚的Hunnu Coal Ltd.计划在2011年下半年开始在蒙古的冶金煤项目,Tsant Uul冶金煤项目中开始煤炭生产。将特许权生产的冶金煤和优质动力煤出口到中国和其他市场。匈奴于2010年5月下旬获得了该项目90%的权益。

著录项

  • 来源
    《The TEX Report》 |2011年第8期|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号