首页> 外文期刊>Platt's Oilgram News >Tests prompt doubts of Kurdamir potential
【24h】

Tests prompt doubts of Kurdamir potential

机译:测试使人们对库达米尔的潜力产生怀疑

获取原文
获取原文并翻译 | 示例
           

摘要

Dubai—The potential of the Talisman Energyoperated Kurdamir block in the northern Iraqi region of Kurdistan may have to be revised after the first two tests of the Kurdamir-3 appraisal well yielded “unexpected” results that increased the risks associated with the current estimate of the field’s oil resources. “The interim test results from Kurdamir-3 have increased the risk associated with the undiscovered prospective resource assessment that the company carries for the Kurdamir Oligocene reservoir,” Talisman’s partner, Canada’s WesternZagros, said Thursday.
机译:迪拜—在伊拉克北部库尔德斯坦地区由塔里曼能源公司运营的库达米勒区块的潜力可能需要进行修改,因为对库达米3号评估井的前两次测试产生了“意外”结果,这增加了与当前估计的风险相关的风险。油田的石油资源。 Talisman的合伙人加拿大WesternZagros表示:“ Kurdamir-3的中期测试结果增加了该公司为Kurdamir渐新世油藏进行的未发现的前瞻性资源评估的风险,”

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号