...
首页> 外文期刊>Platt's Oilgram News >Suncor, Total upgrader project at risk
【24h】

Suncor, Total upgrader project at risk

机译:Suncor,全面升级项目面临风险

获取原文
获取原文并翻译 | 示例
           

摘要

Vancouver-Canadian oil sands powerhouse Suncor Energy and joint venture partner Total have pushed their plans for an economically- challenged 200,000 b/d upgrader in Alberta to the brink of cancellation, after Suncor announced a C$1.49 billion ($1.49 billion) writedown on February 6. CEO Steve Williams said a decision will be made before the end of March on whether to "go ahead with the project as is," or to call a halt to the C$11.6 billion facility, add- ing "there is no easy way to go to a half- or quarter-sized upgrader."
机译:温哥华-加拿大油砂大厂Suncor Energy和合资伙伴道达尔(Total)已于2月6日宣布减记14.9亿加元(14.9亿美元)减产后,将其在艾伯塔省面临经济挑战的200,000桶/天的升级器的计划推到了取消的边缘。首席执行官史蒂夫·威廉姆斯(Steve Williams)表示,将在3月底之前决定是否“按原样推进该项目”,或中止116亿加元的贷款,并补充说“没有简单的方法可以转到一半或四分之一大小的升级程序。”

著录项

  • 来源
    《Platt's Oilgram News》 |2013年第27期|共1页
  • 作者

    Gary Park;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号