首页> 外文期刊>Platt's Oilgram News >BP sees rising cost of Shah Deniz phase two
【24h】

BP sees rising cost of Shah Deniz phase two

机译:BP看到Shah Deniz第二阶段的成本不断上升

获取原文
获取原文并翻译 | 示例
           

摘要

Baku—Total costs for the massive Shah Deniz Phase 2 project, expected to produce 16 billion cubic meters/year of natural gas from 2017, might reach as much as $45 billion, BP Azerbaijan President Rashid Javangir said last week. Speaking at an oil and gas conference in Baku, Javangir said that current budgeting covered around $25 billion for upstream development and expansion of the South Caucasus Pipeline, which carries gas from the Shah Deniz field in the Caspian Sea offshore Azerbaijan to the Georgian border with Turkey.
机译:BP阿塞拜疆石油公司总裁拉希德·爪哇吉尔(Rashid Javangir)上周表示,沙赫·德尼兹(Shah Deniz)二期工程的总成本预计将从2017年开始每年生产160亿立方米天然气,总成本可能高达450亿美元。 Javangir在巴库举行的一次石油和天然气会议上说,目前的预算涵盖了约250亿美元,用于南高加索管道的上游开发和扩建,该管道将天然气从里海Shah Deniz油田从阿塞拜疆的阿塞拜疆海上运往格鲁吉亚与土耳其的边界。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号