首页> 外文期刊>Platt's Oilgram News >Total begins ‘top’ kill of leaking Elgin well in North Sea
【24h】

Total begins ‘top’ kill of leaking Elgin well in North Sea

机译:道达尔开始在北海泄漏“埃尔金”井的“最高”杀戮

获取原文
获取原文并翻译 | 示例
           

摘要

London—French oil major Total has begun the long-awaited “top kill” operation to plug its seven week-old blowout and gas leak at its Elgin field in the UK North Sea, the company said May 15. Total said it started pumping heavy mud into the well from the main support vessel via a temporary pipeline connected to the G4 wellhead. “Depending on the precise conditions inside the well, the operation itself and the subsequent observation period will last a few days before it is possible to confirm whether the operation has been fully effective,” Total said in a statement.
机译:5月15日,法国石油巨头道达尔(Total)已开始期待已久的“致命一击”作业,以堵塞其在英国北海Elgin油田长达7周的井喷和天然气泄漏。道达尔表示,已开始抽油泥浆通过连接到G4井口的临时管线从主要支持船进入井中。道达尔在一份声明中说:“取决于井内的精确条件,该作业本身以及随后的观察期将持续几天,之后才能确认该作业是否完全有效。”

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号