首页> 外文期刊>Platt's Oilgram News >China's third West-East gas line to start by end-2013
【24h】

China's third West-East gas line to start by end-2013

机译:中国的第三条西气东输路线将于2013年底启动

获取原文
获取原文并翻译 | 示例
           

摘要

Singapore-China's third West-East gas pipeline will begin operations by the end of 2013, carrying about 30 billion cubic meters a year of natural gas from Central Asia to the southeastern province of Fujian, state media China Daily reported November 17. The 5,200 km (3224 mile) pipeline project will include one artery, six branch lines, three gas storage facilities and one LNG terminal. The state-owned China National Petroleum Corporation will start construction of the third West-East pipeline this year, the company's newsletter, China Petroleum Daily, said at the end of August.
机译:据官方媒体《中国日报》 11月17日报道,新加坡-中国的第三条西气东输管道将于2013年底开始运营,每年从中亚向东南部福建的天然气输送量约为300亿立方米。 (3224英里)管道工程将包括一条大动脉,六条支线,三处储气设施和一处LNG接收站。该公司的时事通讯《中国石油日报》 8月底表示,国有的中国国家石油天然气集团公司将在今年开始建设第三条西气东输管道。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号