首页> 外文期刊>Platt's Oilgram News >Shtokman FEED work complete, timeline still uncertain
【24h】

Shtokman FEED work complete, timeline still uncertain

机译:Shtokman FEED工作完成,时间表仍不确定

获取原文
获取原文并翻译 | 示例
           

摘要

Moscow-Russian gas giant Gazprom completed the front end engineering and design (FEED) work for the giant Shtokman gas field in the Barents Sea in late 2009, a senior project official said February 3, but the timeline for field development remains uncertain.The fall in demand for foreign gas in the US, Shtokman's main target market, as a result of the dramatic rise in US domestic shale gas production has caused Gazprom to review plans for the project, the first phase of which is being developed together with France's Total and Norway's Statoil (ON 1/28).
机译:莫斯科-俄罗斯天然气巨头俄罗斯天然气工业股份公司(Gazprom)于2009年底完成了在巴伦支海Shtokman天然气田的前端工程设计(FEED)工作,一位高级项目官员表示,该油田开发的时间表尚不确定。由于美国国内页岩气产量的急剧增长,Shtokman的主要目标市场对美国的外国天然气需求增加,导致俄罗斯天然气工业股份公司(Gazprom)对该项目的计划进行了审查,该计划的第一阶段正在与法国的道达尔(Total)和挪威的国家石油(ON 1/28)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号