...
首页> 外文期刊>Mining Journal >Xstrata plans October copper production for Antapaccay
【24h】

Xstrata plans October copper production for Antapaccay

机译:Xstrata计划在10月生产Antapaccay的铜

获取原文
获取原文并翻译 | 示例
           

摘要

XSTRATA plc expected to begin initial production from its Antapaccay copper project in Peru in October, after it started commissioning on time and budget.The group's board of directors approved the US$1.47 billion project about two years ago, and work began in the September quarter of 2010.The 20-year open-pit operation will benefit from close proximity to the Tintaya open-pit mine 10km away, which is in the final stages of its operational life.Antapaccay was designed to produce 70,000t/d of ore, to be treated by a newly built concentrator. Initial production from theTintaya-Antapaccay project was expected to be 160,000t/y copper, plus by-product gold and silver.
机译:XSTRATA plc计划在按时按预算开始调试后,于10月开始在秘鲁的Antapaccay铜矿项目开始生产。该集团的董事会大约两年前批准了这一耗资14.7亿美元的项目,并于9月季度开始工作。 2010年.20年的露天矿运营将受益于紧邻10公里外的廷塔亚露天矿的开采,该矿正处于其使用寿命的最后阶段。安塔帕克西矿的设计产能为日产7万吨/天由新建的选矿厂处理。 Tintaya-Antapaccay项目的初始产量预计为年产16万吨铜,以及副产品黄金和白银。

著录项

  • 来源
    《Mining Journal》 |2012年第10期|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号