...
首页> 外文期刊>Journal Of The South African Institute Of Mining & Metallurgy >Rock engineering method to pre-evaluate old, small coal pillars for secondary mining
【24h】

Rock engineering method to pre-evaluate old, small coal pillars for secondary mining

机译:岩石工程方法对二次开采的旧小煤柱进行预评估

获取原文
获取原文并翻译 | 示例
           

摘要

Due to the approaching depletion of reserves in the Wilbank Coalfield, and the fact that the Waterberg Coalfield is as yel underdeveloped, there is increasing pressure to extend the lives of the operating coal mines in the Wilbank Coalfield. One potential source of coal is the old pillars, often small and at shallow depth, that were not left with secondary extraction in mind. At face value, some of these pillars appear to be suitable for secondary mining due to their high safety factors. However, it is known that over lime, these pillars have scaled and the current sizes are smaller than the as mined dimensions. It is also known that at shallow depth, the overburden is often less likely lo fail during secondary mining, resulting in high abutment loads on the unmincd pillars.
机译:由于威尔班克煤田的储量即将枯竭,以及沃特伯格煤田还处于欠发达状态,因此,延长威尔班克煤田运营煤矿寿命的压力越来越大。一种潜在的煤炭来源是古老的支柱,通常很小,而且深度较浅,没有考虑到二次开采。从表面上看,这些支柱中的一些支柱由于其较高的安全系数而似乎适合二次开采。但是,众所周知,在石灰上,这些支柱已经缩放,并且当前尺寸小于所开采的尺寸。众所周知,在较浅的深度,在二次开采过程中,覆土经常不易发生塌陷,从而导致在未开采的柱子上产生高的桥台载荷。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号