Selection of high-rate gas well completion designs applying multi-criteria decision making and hierarchy methods

机译:应用多准则决策和层次方法选择高气井完井设计

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Selecting the appropriate well completion design, equipment and installation techniques are frequent decisions required of oil and gas operators. Making selections from alternative completion designs can lead to enhanced well productivity, lower capital costs, less coMpletion time and lower intervention/maintenance costs. However, typically there is a tradeoff of these benefits; with certain designs leading to lower costs and others leading to higher productivity or less risk of operational risks and costs. The decision often becomes a strategic one; imposing identified priorities of the operator upon the technical performance and cost assumptions made for each alternative. Multi-criteria decision-making methods (MCDM) offer a means of evaluating such decisions in a consistent and systematic way taking into account available information, assumptions and strategic preferences. MCDM is applied to three high-rate gas-well-completion alternatives, i.e., mono bore (MB), big bore (BB) and optimized big bore (OBB), in order to aid the selection among them given certain strategic priorities. The MCDM techniques applied to gas-well-completion decisions are analytic hierarchy process (AHP) and technique for order of preference by similarity to ideal solution (TOPSIS). The criteria considered by these techniques include: time to run the completion, capital and operating costs involved, gas production rate achieved, and risk exposure associated with each well completion technique. The MCDM applied are particularly effective at providing insight to decisions when sensitivity analysis is conducted based upon different weights (i.e., strategic priorities) applied to the key technical attributes of the well completion alternatives. (C) 2016 Elsevier B.V. All rights reserved.
机译:选择合适的完井设计,设备和安装技术是石油和天然气运营商经常需要做出的决定。从替代完井设计中进行选择可以提高油井生产率,降低资本成本,缩短完成时间并降低干预/维护成本。但是,通常需要权衡这些好处。某些设计可降低成本,而另一些则可提高生产率或降低运营风险和成本风险。这项决定常常成为一项战略决定;将为每种替代方案做出的技术性能和成本假设强加确定的运营商优先级。多标准决策方法(MCDM)提供了一种在考虑到可用信息,假设和战略偏好的情况下,以一致且系统的方式评估此类决策的方法。 MCDM被应用于三种高速率气井完井替代方案,即单孔(MB),大孔(BB)和优化的大孔(OBB),以帮助在确定某些战略优先级的情况下从中进行选择。应用于气井完井决策的MCDM技术是层次分析法(AHP)和与理想解决方案相似的优先顺序技术(TOPSIS)。这些技术考虑的标准包括:完井时间,涉及的资金和运营成本,实现的天然气生产率以及与每种完井技术相关的风险。当基于对完井替代方案的关键技术属性应用不同的权重(即战略优先级)进行敏感性分析时,所应用的MCDM特别有效地为决策提供了见识。 (C)2016 Elsevier B.V.保留所有权利。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号