首页> 外文期刊>Journal of Mining Scinece >INTEGRATED OPEN PIT PUSHBACK SELECTION AND PRODUCTION CAPACITY OPTIMIZATION
【24h】

INTEGRATED OPEN PIT PUSHBACK SELECTION AND PRODUCTION CAPACITY OPTIMIZATION

机译:集成式露天矿回采选择和生产能力优化

获取原文
获取原文并翻译 | 示例
           

摘要

Strategic mine planning for open pits has now evolved to the simultaneous optimization of a number of decisions and this leads to the consideration of additional solutions, with the potential to add value to planning and reduce manual data transfer time. Unlike previous efforts, this paper outlines a method for simultaneously optimizing mining and processing capacities, including intermediate and ultimate pushback selection, with the determination of scheduling, cut-off grade, and stockpiling to maximize net present value.
机译:露天矿的战略性矿山规划现已发展为同时优化许多决策,这导致需要考虑其他解决方案,从而有可能为规划增值,并减少手动数据传输时间。与以前的工作不同,本文概述了一种同时优化采矿和加工能力(包括中间和最终推压选择)的方法,该方法可以确定调度,截止品位和库存以最大化净现值。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号