首页> 外文期刊>Journal of Hydrology >Modelling water quality and quantity with the influence of inter-basin water diversion projects and cascade reservoirs in the Middle-lower Hanjiang River
【24h】

Modelling water quality and quantity with the influence of inter-basin water diversion projects and cascade reservoirs in the Middle-lower Hanjiang River

机译:汉江中下游跨流域调水工程和梯级水库对水质和水量的模拟

获取原文
获取原文并翻译 | 示例
           

摘要

The effects of inter-basin water diversion projects and cascade reservoirs are typically complex and challenging, as the uncertain temporal-spatial variation of both water quality and quantity. The purpose of this paper is to propose a coupled 1D hydrodynamic model with water-quality model to analyze the effects of current and future inter-basin water diversion projects, i.e., South-to-North Water Diversion Project (SNWD) and Yangtze-Hanjiang Water Diversion Project (YHWD), and cascade reservoirs (CRS) on water quantity and quality in the middle-lower Hanjiang River. Considering water use and pollution contribution, the middle-lower Hanjaing River basin is generalized and divided into 18 land use units with tributaries, reservoirs and water exchanges. Each unit is considered with the processes of lateral inflow, point and non-point pollution loads, irrigation return flow, and stream-aquifer exchanges in the model. The long-term time series from 1956 to 1998 of water quality and quantity with four engineering scenarios is collected. The validation of results shows that the relative errors between the simulated and observed values at certain control sections are within 5% for water levels and 20% for water quality. The water level will be decreased by 0.38-0.65 m (decreasing rate 0.44-2.68%), the annual runoff will be significantly decreased over 4 billion m(3) and the water quality will be changed after the SNWD. As a compensation project, the YHWD partly offsets the negative effects of the SNWD in water flow rate, but at the same time it rises the water level and reduces the flow velocity. This, together with the effect of cascade reservoirs, leads to water quality concentration increasing and deteriorating to Grade IV of the Chinese Surface Water Quality Criteria. The water resource reduction and water quality problems in the Middle-lower Hanjiang River require attention after these projects. (C) 2016 Elsevier B.V. All rights reserved.
机译:跨流域调水工程和梯级水库的影响通常是复杂而具有挑战性的,因为水质和水量的时空变化都不确定。本文的目的是提出一个与水质模型耦合的一维水动力模型,以分析当前和未来的跨流域跨水工程,即南水北调工程和长江汉江的影响。引水工程(YHWD)和汉江中下游水量和水质梯级水库(CRS)。考虑到用水和污染的影响,将汉江中下游流域进行了概括,分为18个土地利用单位,包括支流,水库和水交换。模型中考虑了每个单元的侧向入水,点和非点污染负荷,灌溉回水流量和水-含水层交换的过程。收集了1956年至1998年的水质和水量的长期时间序列,以及四种工程情景。结果验证表明,在某些控制区域,模拟值和观测值之间的相对误差对于水位而言不超过5%,而对于水质而言不超过20%。 SNWD后,水位将下降0.38-0.65 m(下降率0.44-2.68%),年径流量将大大减少超过40亿m(3),水质将发生变化。作为一项补偿项目,YHWD可以部分抵消SNWD对水流量的负面影响,但同时它会提高水位并降低流速。再加上梯级水库的影响,导致水质浓度升高,并恶化到中国地表水质标准的IV级。这些项目之后,汉江中下游的水资源减少和水质问题需要引起注意。 (C)2016 Elsevier B.V.保留所有权利。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号