...
首页> 外文期刊>Daily Oil Bulletin >Keystone Attracting New Shippers As Oilsands Upgrading Projects Delayed
【24h】

Keystone Attracting New Shippers As Oilsands Upgrading Projects Delayed

机译:由于油砂升级项目推迟,基石吸引了新的托运人

获取原文
获取原文并翻译 | 示例
           

摘要

With delays in oilsands upgrading projects, TransCanada Corporation has been fielding calls from additional shippers looking for capacity on the Keystone expansion project to the United States Gulf of Mexico."In on top of our contracted volumes we are having a number of shippers coming to us that we hadn't talked to before," Russ Girling, president of pipelines, said Tuesday in a conference call. They had thought they would be able to upgrade their crudes and potentially move them to other markets but now looking at the Gulf Coast as the most logical outlet for their volumes, he said.
机译:由于油砂升级项目的延迟,TransCanada Corporation一直在接听其他托运人的电话,以寻找Keystone扩建项目到美国墨西哥湾的能力。“在我们的合同量之上,我们吸引了许多托运人我们从未与之交谈过,”管道总裁拉斯宁(Russ Girling)周二在电话会议上说。他说,他们曾以为他们可以升级原油并将其转移到其他市场,但现在他们把墨西哥湾沿岸看做是最合理的出口渠道。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号