首页> 外文期刊>Zeitschrift fur Geomorphologie >Reconstruction of a colluvial body using geoelectrical resistivity
【24h】

Reconstruction of a colluvial body using geoelectrical resistivity

机译:利用地电电阻率重建冲积体

获取原文
获取原文并翻译 | 示例
       

摘要

We reconstructed a colluvial fill in a relict gully on the middle slope of a loess covered area of the Plelser Hugelland near Bonn, Germany. The morphology of the site gives no indication of the existence of such a feature, and we adopted geoelectrical soundings as a means of both detecting and delineating it. Promising results showed that the electrical resistivity of colluvium and its parent material differs by up to 50%. The volume of the colluvial body has been reconstructed with the aid of a series of soil augerings. The volume of the linear feature perpendicular to the slope was calculated as 2,641 m(3) +/- 383.05 m(3). Though it is small in size we argue that the existence of a colluvial body in such an unexpected slope situation has implications for reconstruction of long-term landscape evolution and for closure of long-term sediment budgets.
机译:我们在德国波恩附近的Pelelser Hugelland的一个黄土覆盖地区的中坡上,在一个遗迹沟中重建了一个河谷填充物。该地点的形态没有迹象表明存在这种特征,我们采用了地电测深法来检测和描绘该特征。有希望的结果表明,胶体及其母体材料的电阻率相差高达50%。在一系列土壤钻饰的帮助下重建了冲积体的体积。垂直于斜率的线性特征的体积计算为2,641 m(3)+/- 383.05 m(3)。尽管规模很小,但我们认为在这种意外的斜坡情况下存在冲积体,对重建长期的景观演化和封闭长期的沉积物预算有影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号