首页> 外文期刊>Hydrocarbon Processing >Why users must update design contractors' understanding
【24h】

Why users must update design contractors' understanding

机译:用户为何必须更新设计承包商的理解

获取原文
获取原文并翻译 | 示例
           

摘要

In early 2012, a rotating equipment engineer was involved in a machinery quality assessment (MQA). Located halfway around the globe, this engineer's new job was to oversee the engineering, procurement and construction (EPC) company and to ensure that the multinational owner-operators long-term reliability interests were understood and carried out. However, as best-of-class (BOC) owners know, EPC companies are primarily geared to low initial cost and on-schedule plant startups. So, reasonable compromises must be found among the initial cost, safe long-term equipment performance, life-cycle cost (cost of ownership) and project schedules. BOC owner-operators have formalized and institutionalized MQA with the goal of identifying the right compromises.
机译:2012年初,一名旋转设备工程师参与了机械质量评估(MQA)。这位工程师位于全球的一半,他的新工作是监督工程,采购和建筑(EPC)公司,并确保了解和执行跨国业主与运营商的长期可靠性利益。但是,正如最佳(BOC)所有者所知,EPC公司主要是针对较低的初始成本和按计划的工厂启动。因此,必须在初始成本,安全的长期设备性能,生命周期成本(拥有成本)和项目进度表之间找到合理的折衷方案。中银业主与运营商已将MQA规范化并制度化,以期找出正确的妥协方案。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号