We present the results of experimental investigations of heat exchanging in a cylindrical tube heated on one side by beams of charged particles (electrons) with a high density of thermal energy. Heat removal is made by a water stream, twisted by a screw insert, having the mass velocities in the range ρw = 187O-8900 kg/(m{sup}2·sec). The experiments were carried out on a fragment of the tube in the receiver of the beams of deviated ions in the system of injection of a T-15 tokamak. The bank of experimental data includes 510 points. It is shown that under the conditions of heat removal by the twisted flow with the coefficient of twisting k = 0.897 and subcooling ~170℃ the density of the flux removed can attain 100 MV/m{sup}2 in the case of long-pulse heating. It is noted that with the number of cycles of about 70 the fatigue destruction of the surface occurs.
展开▼
机译:我们提出了在具有高热能密度的带电粒子(电子)束对一侧加热的圆柱管中进行热交换的实验研究的结果。通过水流进行加热,该水流通过螺杆插入物扭转,其质量速度在ρw= 187O-8900 kg /(m {sup} 2·sec)的范围内。实验是在T-15托卡马克注射系统中,在偏离离子束接收器中的管子片段上进行的。实验数据库包含510点。结果表明,在扭流系数为k = 0.897,过冷度为〜170℃的条件下,通过扭流除热,在长脉冲情况下,去除的磁通密度可以达到100 MV / m {sup} 2。加热。应当指出的是,在约70次的循环次数下,发生了表面的疲劳破坏。
展开▼