The LNG import terminal that ConocoPhillips hopes to build at Teesside,in the UK,will initially have 5 million tons (6.9 billion cubic meters) per year of send-out capacity,expandable to 15 million tons/yr (20.7 Bcm/yr),with at least two and up to six 190,000 cubic meter LNG storage tanks,the company disclosed as part of its request for planning consent filed in mid-July with the Stockton local authority.
展开▼