With the peak summer demand season looming, Iraq's efforts to hoist power generation capacity to ease blackouts are flagging. Some 4 gigawatts of capacity could be added in 2013, but that includes plants expected on line last year, while nearly 1.5 GW won't start up before September, at the earliest, too late for summer.
展开▼