...
首页> 外文期刊>Water Science and Technology >Relocation of dredged material from Hamburg harbour in the River Elbe
【24h】

Relocation of dredged material from Hamburg harbour in the River Elbe

机译:从易北河汉堡港口疏of的物料迁移

获取原文
获取原文并翻译 | 示例
           

摘要

Besides the beneficial use of dredged material, sustainable relocation, which means keeping the sediments in the natural aquatic material circulation, is one goal for handling dredged material in the port of Hamburg. Decreasing contamination the River Elbe and new dredged material guidelines provide a basis for this. With comprehensive investigations, near- and far-field transport and the effects of relocation regarding the water quality and the benthic community were determined thus deveoloping conditions for future operating strategies. (C) 1998 IAWQ. Published by Elsevier Science Ltd. [References: 3]
机译:除了对疏use材料的有益利用外,可持续迁移(这意味着将沉积物保持在自然水生材料循环中)是汉堡港处理疏material材料的目标之一。减少污染易北河和新的疏material材料指南为此奠定了基础。通过全面调查,确定了近距离和远距离运输以及搬迁对水质和底栖生物的影响,从而为未来的经营策略提供了条件。 (C)1998 IAWQ。由Elsevier Science Ltd.发布[参考:3]

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号