...
首页> 外文期刊>Transmission & Distribution World: The Information Leader Serving the Worldwide Power-Delivery Industry >EGAT completes major energy expansion: a 500-kV double-circuit compact transmission line solves Bangkok's right-of-way problem
【24h】

EGAT completes major energy expansion: a 500-kV double-circuit compact transmission line solves Bangkok's right-of-way problem

机译:EGAT完成了重大的能源扩张:500 kV双回路紧凑型输电线路解决了曼谷的通行权问题

获取原文
获取原文并翻译 | 示例
           

摘要

Rapid development in the Greater Bangkok area is leading to a substantial increase in the demand for energy. This expansion is particularly challenging for the Electricity Generating Authority of Thailand (EGAT). As land acquisition for additional substations and rights of way (R/W) for new transmission circuits is increasingly difficult and expensive, EGAT decided to upgrade the power-transfer capability of the existing 230-kV double-circuit lines by constructing new 500-kV double-circuit compact lines.
机译:大曼谷地区的快速发展正导致对能源需求的大幅增长。对于泰国发电局(EGAT)而言,这一扩张尤其具有挑战性。由于增加变电站的土地征用和新传输电路的通行权(R / W)越来越困难和昂贵,EGAT决定通过建造新的500 kV来升级现有230 kV双回线的输电能力双回路紧凑型生产线。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号