Wuhan Petrochemical Company Ltd.conducted intermediate handing-over for its 1.2 million t/a delayed coking unit on April 11th.It is the second unit that has been conducted intermediate handing-over in the four new units of the refining renovation project in the company.Besides the delayed coking unit,the company's refining renovation projects also include a 5.0 million t/a atmospheric and vacuum distillation unit,a 1.9 million t/a diesel hydrogenation unit,a 60 000 t/a sulfur recovery unit,a 2.0 million t/a hydrocracking unit,a 1.8 million t/a catalytic raw material hydrotreating unit and a hydrogen preparation unit.
展开▼