...
首页> 外文期刊>The ITEA Journal of Test and Evaluation >Assessing Risk Levels of Verification, Validation, and Accreditation of Models and Simulations
【24h】

Assessing Risk Levels of Verification, Validation, and Accreditation of Models and Simulations

机译:评估模型和仿真的验证,确认和认可的风险等级

获取原文
获取原文并翻译 | 示例
           

摘要

This article presents a new methodology for assessing the risks associated with the level of verification, validation, and accreditation (W&A) of a given model and/or simulation when used in support of major decisions. As stated by Department of Defense (DoD) Instruction 5000.61 (DOD, 2003), "It is DoD policy that: models and simulations (M&S) used to support major DoD decision-making organizations and processes shall be accredited for that specific purpose by the DoD component M&S application sponsor." Instruction 5000.61 applies to "All models and simulations developed, used, or managed by the DoD components after the effective date of this instruction." The requirements cited above have set the need for W&A of M&S at the forefront of concerns for DoD and DoD-Component acquisition personnel. When an acquisition program involves a large number of models, cost associated with W&A can become enormous. There is a need therefore to have a systematic approach for assessing and prioritizing the risks associated with the level to which individual models have been verified, validated, and accredited. To provide decision-makers with a judicious way for determining the risks associated with using a given M&S, and the extent to which W&A work will be needed to meet these requirements, a methodology is developed for assessing the risks associated with the level of Wr&A of a given M&S when used to support decision-making. This approach parallels the formal DoD Risk Assessment procedure, but with application to the use of M&S, as it relates to W&A.
机译:本文提出了一种新的方法,用于评估在支持重大决策时与给定模型和/或仿真的验证,确认和认证(W&A)级别相关的风险。如美国国防部(DoD)指令5000.61(国防部,2003年)所述,“国防部的政策是:用于支持主要国防部决策组织和过程的模型和仿真(M&S)必须得到国防部为此目的的认可。国防部组件M&S应用程序赞助商。”指令5000.61适用于“在本指令生效日期之后由DoD组件开发,使用或管理的所有模型和仿真”。上面提到的要求已将对M&S进行W&A的需求置于DoD和DoD组件采购人员关注的最重要位置。当采购计划涉及大量模型时,与W&A相关的成本可能变得巨大。因此,需要一种系统的方法来评估和确定与各个模型已被验证,确认和认可的水平相关的风险并确定优先级。为了给决策者提供明智的方式来确定与使用给定的M&S相关的风险,以及满足这些要求所需的W&A工作的程度,开发了一种方法来评估与W&A水平相关的风险。用于支持决策的给定M&S。这种方法与正式的DoD风险评估程序相似,但与W&A有关,也适用于M&S的使用。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号