...
首页> 外文期刊>The Australian pipeliner >It's got the power: the EGP delivers
【24h】

It's got the power: the EGP delivers

机译:功能强大:EGP可提供

获取原文
获取原文并翻译 | 示例
           

摘要

With work on the project beginning in January 2015, the 293 km DN200 high pressure natural gas pipeline has been defined by the speed in which it has been constructed, with testing completed in October 2015. Spiecapag Lucas (SCL) role as main contractor saw the company responsible for the construction, installation and testing of the Eastern Goldfields Pipeline (EGP), from APA Group's Murrin Murrin lateral to the AngloGold Ashanti (AGA) Sunrise Dam mine and onwards to AGA's Tropicana mine.
机译:随着该项目的工作于2015年1月开始,这条293公里的DN200高压天然气管道的建造速度已经确定,并于2015年10月完成了测试。Spiecapag Lucas(SCL)作为主要承包商,看到了该公司负责从APA Group的Murrin Murrin到AngloGold Ashanti(AGA)Sunrise Dam矿山,再到AGA的Tropicana矿山的东部金矿管道(EGP)的建设,安装和测试。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号