...
首页> 外文期刊>TEX Energy Report >Loading Capacity at Sakhalin’s Shakhtersk Port to be Raised After Spring
【24h】

Loading Capacity at Sakhalin’s Shakhtersk Port to be Raised After Spring

机译:萨哈林岛的Shakhtersk港口的装卸能力将于春季后提高

获取原文
获取原文并翻译 | 示例
           

摘要

Loading capacity at Shakhtersk Port at Sakhalin will be raised after this spring. A subsidiary to Shakhalinugol operates the port. Shakhalinugol plans to start using a floating crane from this coming spring in order to reduce the days required for loading coal. The seafloor around the port is not deep enough, which only allows coal carriers with 5,000 dwt or smaller to be loaded at the berth. Ships larger are required stay anchored off shore to receive coal from coal barges.
机译:今年春天之后,将提高萨哈林岛Shakhtersk港口的装卸能力。 Shakhalinugol的子公司经营该港口。 Shakhalinugol计划从今春开始使用浮吊,以减少装煤所需的时间。港口周围的海底不够深,仅允许将5,000 dwt或更小的载煤船装载到泊位。需要较大的船舶锚定离岸,以从驳船中接收煤炭。

著录项

  • 来源
    《TEX Energy Report》 |2015年第2815期|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 工业经济;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号