...
首页> 外文期刊>platts Inside FERC's Gas Market Report >EPA regional office finds draft EIS insufficient for two big pipe projects
【24h】

EPA regional office finds draft EIS insufficient for two big pipe projects

机译:EPA区域办事处发现EIS草案不足以解决两个大型管道项目

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

A regional office of the Environmental Protection Agency has found the draft environmental impact statement for two sizable expansion projects, one by Columbia Gulf Transmission and another by Columbia Gas Transmission, to be insufficient. At issue are Columbia’s Leach Xpress (CP15-514), proposed last June to add about 160 miles new pipeline and about 143,000 hp of compression in West Virginia, Pennsylvania and Ohio, increasing capacity by about 1.53 million Dt/d; and Columbia Gulf’s Rayne Xpress (CP15-539), proposed in July to add 51,800 hp of compression at two stations and modify a regulation station in Kentucky to send an additional 621,000 Dt/d of Appalachian natural gas south to the Gulf Coast.
机译:环境保护局的一个地区办事处发现,两个大型扩建项目的环境影响声明草案是不够的,一个是哥伦比亚海湾传输公司,另一个是哥伦比亚天然气传输公司。问题在于哥伦比亚的Leach Xpress(CP15-514),该产品于去年6月提出,将在西弗吉尼亚,宾夕法尼亚和俄亥俄州增加约160英里的新管道和约143,000 hp的压缩力,从而将产能提高约153万Dt / d。哥伦比亚海湾公司的Rayne Xpress(CP15-539)则在7月份建议在两个站点增加51,800 hp的压缩功率,并修改肯塔基州的一个监管站点,向南部向墨西哥湾海岸输送621,000 Dt / d的阿巴拉契亚天然气。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号