首页> 外文期刊>platts Inside FERC's Gas Market Report >Mackenzie Gas Project still has long way to go before projected start-up
【24h】

Mackenzie Gas Project still has long way to go before projected start-up

机译:Mackenzie天然气项目在预计启动之前还有很长的路要走

获取原文
获取原文并翻译 | 示例
           

摘要

Canada has concluded the final regulatory hearings into proposals for a ground-breaking gas pipelineout of its Arctic region, but what was once seen as a milestone in a decade-long process is now littlemore than a signpost, indicating how far the Mackenzie Gas Project has yet to travel. Hearings by theJoint Review Panel into the potential social and environmental impacts of the MGP and by Canada'sNational Energy Board into economic and engineering issues took more than double the expected time— enough for shale gas to emerge and overtake Arctic gas as North America's next major supplysource.
机译:加拿大已经完成了最终监管听证会,提出了关于北极地区突破性天然气管道建设的提案,但是,过去十年来一直被视为里程碑的现在只是一个路标,表明了麦肯齐天然气项目已经走了多远尚未旅行。联合审核小组对MGP潜在的社会和环境影响进行的听证会,以及加拿大国家能源委员会对经济和工程问题的听证会,花费了预期时间的两倍以上,足以使页岩气出现并取代北极成为北美的下一个主要天然气供应源。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号