...
首页> 外文期刊>World highways >Oslofjord Tunnel repairs
【24h】

Oslofjord Tunnel repairs

机译:奥斯陆峡湾隧道维修

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

The 7km subsea Oslofjord Tunnel in Norway was temporarily closed last month after a truck caught fire in the tunnel on May 5. Norwegian media reported that a 500m stretch was damaged - tunnel vault, cables, insulation and road surface. The tunnel is equipped with 25 evacuation rooms that can be sealed off from the main tunnel. Each room can provide pressurised space for up to 50 people while a fire is being fought. However, the latest incident has spurred the government to announce that a second tube will be built to hopefully reduce closures and improve safety.
机译:挪威5月5日,一辆卡车在隧道内起火后,挪威长7公里的海底Oslofjord隧道于上月暂时关闭。挪威媒体报道说,一条500 m的延伸段被损坏-隧道拱顶,电缆,绝缘材料和路面。该隧道配备了25个疏散室,可以将其与主隧道隔离。扑灭大火时,每个房间可提供多达50人的加压空间。然而,最近发生的事件促使政府宣布将建造第二条管道,以期有望减少封盖并提高安全性。

著录项

  • 来源
    《World highways》 |2017年第5期|18.4-18.4|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号