首页> 外文期刊>WaterShapes >Expert Oversight
【24h】

Expert Oversight

机译:专家监督

获取原文
获取原文并翻译 | 示例
           

摘要

In the last several of these "Details," I've covered what happens in my projects before construction begins. Now we're ready to shift gears and look at what happens on site - the place where design and execution meet. Before we look at the way I build things, however, I want to take a hard look at common practices in the field. What I write here may seem harsh, but it's not intended that way: To establish a baseline for doing things in what I would term the right way, I need to point to practices in our industry — particularly the pool/spa sector - that cause problems for all of us who want to take the high road and do right by our clients.
机译:在这些“细节”的最后几个中,我介绍了在开始施工之前项目中发生的情况。现在,我们可以换档了,看看现场发生了什么—设计与执行相遇的地方。但是,在介绍构建事物的方式之前,我想仔细研究一下该领域的常见做法。我在这里写的内容可能看起来很苛刻,但并不是这样的意思:要建立以我认为正确的方式行事的基准,我需要指出我们行业的实践,尤其是泳池/水疗行业的实践,对于我们所有想要走高路并由客户做对的人来说都是难题。

著录项

  • 来源
    《WaterShapes》 |2007年第6期|p.22242628-31|共7页
  • 作者

    David Tisherman;

  • 作者单位

    Liquid Design of Cherry Hill, N.J.;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 建筑科学;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号