North Downs Tunnel technical overview

机译:北唐斯隧道技术概述

获取原文
获取原文并翻译 | 示例
           

摘要

The North Downs Tunnel forms part of Section 1 of the Channel Tunnel Rail Link (CTRL, route shown in Figure 1), to be opened later this year, and is the only CTRL tunnel constructed by Eurolink using the principals of NATM. The tunnel lies to the south of Chatham with it's north-west portal (London Portal) situated at the head of the Nashenden Valley and it's south-eastern portal (Country Portal) located as the tunnel emerges from beneath the escarpment face of Bluebell Hill. At 3.2km in length and an excavated cross section of up to 174m~2 (13m diameter), it is also one of the largest rail tunnels to be constructed in Europe. The tunnel traverses through a varied sequence of chalk beds at a depth of up to 100m below the ground surface. Constructed five months ahead of programme and substantially under target cost, the background to its design and construction is therefore of considerable interest with much of its success being attributed to the technical innovation, value engineering and integrated observational approach adopted throughout its construction. A summary of some of the more important aspects is outlined below.
机译:North Downs隧道是Channel Tunnel Rail Link(CTRL隧道,图1中所示的路线)第1部分的一部分,将于今年晚些时候开放,并且是Eurolink唯一使用NATM原理建造的CTRL隧道。隧道位于查塔姆(Chatham)的南部,西北门户(伦敦门户)位于纳申登谷(Nashenden Valley)的头部,东南门户(国家门户(Country Portal))位于隧道从蓝铃山的陡坡面露出时出现。它长3.2公里,开挖断面长达174m〜2(直径13m),也是欧洲最大的铁路隧道之一。隧道横穿地下不同高度的粉笔层,最高可达100m。因此,该项目比计划提前五个月建造,并且基本上低于目标成本,因此其设计和建造的背景引起了极大的兴趣,其成功的大部分归功于整个建造过程中采用的技术创新,价值工程和综合观测方法。下面概述了一些更重要的方面。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号