...
首页> 外文期刊>Tunnelling and underground space technology >The performance prediction of impact hammers from Schmidt hammer rebound values in Istanbul metro tunnel drivages
【24h】

The performance prediction of impact hammers from Schmidt hammer rebound values in Istanbul metro tunnel drivages

机译:从施密特锤反弹值在伊斯坦布尔地铁隧道掘进中预测冲击锤的性能

获取原文
获取原文并翻译 | 示例
           

摘要

The construction of the first metro line in Istanbul was realized between Galata and Beyoglu by a French Engineer Henry Gavand in January 1875. Six different metro projects were submitted since then to the Turkish authorities. The construction of 7- Km metro tunnels phase 1 started in 1992 and the metro line of the phase 1 is opened to the service in 2000. The tunnels of the Phase 2 between Taksim and Yenikapi are under construction. This paper summarizes the construction methods of the Istanbul Metro tunnels, the performance of the impact hammers, the factors effecting daily advance rates and the previous studies on Schmidt hammer test and performance prediction of impact hammers.
机译:1875年1月,法国工程师亨利·加万德(Henry Gavand)在加拉塔(Galata)和贝尤格卢(Beyoglu)之间实现了伊斯坦布尔第一条地铁线路的建设。此后,向土耳其当局提交了六个不同的地铁项目。 1公里长的7公里地铁隧道的建设始于1992年,而1期的地铁线已于2000年投入使用。塔克西姆和叶尼卡皮之间的2期隧道正在建设中。本文总结了伊斯坦布尔地铁隧道的施工方法,冲击锤的性能,影响日行进速度的因素以及有关施密特锤试验和冲击锤性能预测的先前研究。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号