Considerations and strategies behind the design and construction requirements of the Istanbul Strait immersed tunnel

机译:伊斯坦布尔海峡沉管隧道设计和施工要求背后的思考和策略

获取原文
获取原文并翻译 | 示例
           

摘要

This being a design-build project, the challenge faced during preparations of the Employer's requirements for design and construction of the Istanbul Strait immersed tunnel was to give the contractor as much freedom as possible and yet specify enough so that the Employer obtained the required facility. When completed, this will be a world-class facility. This paper discusses on a strategic level many of the aspects to be presented by the author in two papers in later sessions of the day. Unusual features of this crossing include the deepest ever immersed tunnel crossing, extra waterproofing requirements, strong currents with bi-directional flow, close proximity of the North Anatolian Fault which is predicted to have a major seismic event during the life of the tunnel, and the method of connecting the adjacent bored tunnels to the immersed tunnel. Safety during tunnel construction and operation has been paramount, and resulted in changes to contract packaging and extra requirements. Other challenges discussed include fish migration, control of an international waterway, environmental issues and ensuring the stability of the soft soils during a seismic event.
机译:这是一个设计建造项目,在准备雇主对伊斯坦布尔海峡沉管隧道的设计和施工的要求时,面临的挑战是为承包商提供尽可能多的自由度,同时又要进行充分指定,以便雇主获得所需的设施。完成后,这将是世界一流的设施。本文在战略层面上讨论了作者在当天晚些时候的两篇论文中要介绍的许多方面。该过境点的不寻常特征包括有史以来最深的沉管隧道过境点,额外的防水要求,具有双向流动的强流,北安那托利亚断裂带的近距离,预计该断裂带将在隧道寿命期间发生重大地震,以及将相邻钻孔隧道连接到沉管隧道的方法。隧道建设和运营过程中的安全至关重要,并导致合同包装的变更和额外要求。讨论的其他挑战包括鱼类迁移,国际水道控制,环境问题以及在地震事件中确保软土的稳定性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号