Behavior of the ground in rectangularly crossed area due to tunnel excavation under the existing tunnel

机译:在既有隧道下因开挖隧道而在矩形交叉区域中的地面行为

获取原文
获取原文并翻译 | 示例
           

摘要

In this paper, the study was focused on the ground behavior around tunnel-crossing zone and the existing tunnel behavior located above the newly excavated tunnel. Several large-scale model tests were carried out in the 1/12 scale for a field tunnel in practice where the upper tunnel had 7.2 m diameter and 8.4 m overburden and the lower tunnel of 10.8 m diameter was located below the upper tunnel with 8.4 m clearance. The 1/12 scale model was constructed in a large-scale test pit in the dimension of 4.0 m width, 3.8 m height and 4.1 m length. The ground density was controlled by sand raining to get uniform middle density. The existing upper tunnel had 60 cm diameter and the steel lining of 4 mm thickness. The upper tunnel lining was buried during the in situ ground build-up. The lower tunnel was excavated in 90 cm diameter and supported by steel liner of 4.5 mm thickness at each construction phase of 30 cm advance length.
机译:在本文中,研究集中在隧道穿越区域周围的地面行为以及位于新开挖隧道上方的现有隧道行为。实际上,在野外隧道中以1/12比例进行了几次大规模模型测试,其中上部隧道的直径为7.2 m,覆盖层为8.4 m,下部隧道的直径为10.8 m,位于上部隧道的下方,距离为8.4 m清除。 1/12比例模型是在大型测试坑中构建的,尺寸为宽度4.0 m,高度3.8 m和长度4.1 m。通过沙雨控制地面密度,以获得均匀的中间密度。现有的上部隧道直径为60厘米,钢衬为4毫米厚。上部隧道衬砌在原位地面堆积期间被掩埋。下部隧道的开挖直径为90 cm,并在每个施工阶段提前30 cm时由4.5 mm厚度的钢衬板支撑。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号