首页> 外文期刊>Thermal engineering >Thermal and Chemical Tests of the Steam Generator of Unit 3 at the Kalinin Nuclear Power Station
【24h】

Thermal and Chemical Tests of the Steam Generator of Unit 3 at the Kalinin Nuclear Power Station

机译:加里宁核电站3号机组蒸汽发生器的热化学试验

获取原文
获取原文并翻译 | 示例
           

摘要

The results obtained from combined thermal and chemical tests of the steam generator of Unit 3 at the Kalinin nuclear power station are summarized. The obtained data are compared with the results of thermal and chemical tests carried out on steam generators at other nuclear power stations equipped with VVER-1000 reactors, and recommendations on selecting the steam-generator blowdown schedule are given.
机译:总结了在Kalinin核电站对3号机组蒸汽发生器进行热化学测试的综合结果。将获得的数据与在其他装有VVER-1000反应堆的核电站的蒸汽发生器上进行的热化学试验结果进行比较,并给出了选择蒸汽发生器排污时间表的建议。