The latest schedule for the restoration of Cotswold Steam Preservation Ltd's GWR 2800 class 2-8-0 No. 2807 envisages the boiler being hydraulically tested at Llangollen in October.rnA steam test and lifting of the boiler into the frames should follow in November with a working steam test likely in December.rnFor initial trials on the Llangollen Railway, the locomotive will 'borrow' the tender from No. 7822 Foxcote Manor before No. 2807 returns to Toddington.
展开▼