首页> 外文期刊>The architects' journal >Sustainability in Practice
【24h】

Sustainability in Practice

机译:实践中的可持续性

获取原文
获取原文并翻译 | 示例
           

摘要

In 2007, Welsh wind farm developer and first-time client West Coast Energy approached the RIBA to recommend local architects for its new offices in Mold, North Wales. Of the six practices suggested by the client advisory service, Liverpool-based Aire Design's 'passion shone through above anyone else', according to West Coast Energy's director Paula Jewson. The client's one-page brief asked for 'light and airy' offices that exemplified sustainable design and would be as carbon-neutral as possible. Aire Design's first move was to persuade the client to go for B REE AM Excellent standard, with a long-term strategy for zero carbon. Aire Design director Doug Clelland advised that a well-insulated, airtight building would save costs on mechanical systems.
机译:2007年,威尔士风电场开发商和首次客户西海岸能源(West Coast Energy)向RIBA寻求建议,在北威尔士摩尔的新办公室中聘请当地建筑师。根据西海岸能源总监Paula Jewson的说法,在客户咨询服务提出的六种做法中,基于利物浦的Aire Design的“激情超越任何其他人”。客户的一页简介要求建立“轻便通风”的办公室,这些办公室体现了可持续性设计,并且将尽可能实现碳中和。 Aire Design的第一步是说服客户采用B REE AM卓越标准,并制定了零碳排放的长期战略。 Aire设计总监Doug Clelland建议,良好隔热的气密建筑物可以节省机械系统的成本。

著录项

  • 来源
    《The architects' journal》 |2009年第19期|p.34-37|共4页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号