首页> 外文期刊>Shock and vibration >Information-Based Construction of High-Speed Railway Tunnel
【24h】

Information-Based Construction of High-Speed Railway Tunnel

机译:信息化建设高速铁路隧道

获取原文
获取原文并翻译 | 示例
           

摘要

Nowadays, railway tunnel construction faces huge developments and opportunities, with a tendency for high speed and long distance. How to effectively apply the information in the construction process has been the focus of current research. According to the Xian-nvyan tunnel in Xicheng high-speed railway, our research was based on the geological forecast, selecting appropriate tunneling model parameters to establish the 3D calculation model. Through the numerical simulation of three tunnel excavation and support methods, we analyzed the displacement of surrounding rock and the plastic failure to select the construction method reasonably. Compared with the actual measured data, we judged the rationality of the selected scheme and model parameters, so as to provide design parameters which conform to the surrounding rock properties for the subsequent construction, thus optimizing the construction program and applying the concept of information-based construction in engineering actually.
机译:如今,铁路隧道建设面临着巨大的发展和机遇,并具有高速,长距离的趋势。如何在施工过程中有效地运用信息一直是当前研究的重点。根据西城高速铁路的仙女岩隧道,我们的研究是基于地质预报,选择合适的隧道模型参数来建立3D计算模型。通过对三种隧道开挖及支护方法的数值模拟,分析了围岩的位移和塑性破坏,合理选择了施工方法。通过与实测数据的比较,判断所选择方案和模型参数的合理性,为后续施工提供符合围岩性质的设计参数,从而优化了施工方案,运用了信息化的理念。工程中的实际施工。

著录项

  • 来源
    《Shock and vibration》 |2017年第7期|5318785.1-5318785.11|共11页
  • 作者

    Yang Qian; Wang Zhaoling;

  • 作者单位

    Sichuan Agr Univ Chengdu 611830 Sichuan Peoples R China;

  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号