The Consequences of failing to comply with notice provisions in construction contracts can be serious. Two recent cases highlight the need for architects to take care when advising on the service of notices.rnIn WW Gear Construction Ltd v McGee Group Ltd, the parties had entered into an amended form of the JCT Trade Contract Terms 2002 edition. A dispute arose as to whether or not McGee's ability to claim loss and expense was conditional upon it having made an application to the construction manager within two months of it becoming apparent that progress of the works had been delayed.
机译:不遵守施工合同中通知规定的后果可能很严重。最近发生的两起案件突显了建筑师在就通知书提供意见时必须谨慎。麦吉的索赔损失和费用的能力是否取决于在明显的工程进度被延迟后两个月内向施工经理提出申请的问题引起了争议。

著录项

  • 来源
    《RIBA Journal》 |2010年第10期|p.82|共1页
  • 作者

    Doug Wass;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号