首页> 外文期刊>Railway Track and Structures >G&W reduces 2016 capital plan by nearly 30 percent
【24h】

G&W reduces 2016 capital plan by nearly 30 percent

机译:G&W将2016年的资本计划减少了近30%

获取原文
获取原文并翻译 | 示例
           

摘要

Genesee &Wyoming Inc. (G&W) will target a $225 million capital program in 2016, which is down approximately 28 percent when compared to its 2015 spend of $315 million. The majority of the program, $112 million, will go toward track and structure renewals. That number is down $48 million over 2015. G&W will spend $63 million on equipment and other expenditures, which is down $ 10 million from last year. New business and investments are targeted at $35 million and grant matching capital is budgeted at $15 million in 2016.
机译:Genesee&Wyoming Inc.(G&W)的目标是在2016年实现2.25亿美元的资本计划,与2015年的3.15亿美元相比,下降了约28%。该计划的大部分(1.12亿美元)将用于轨道和结构更新。这个数字比2015年减少了4800万美元。G&W将在设备和其他支出上花费6300万美元,比去年减少1000万美元。新业务和投资目标为3500万美元,2016年的补助配套资金预算为1500万美元。

著录项

  • 来源
    《Railway Track and Structures》 |2016年第3期|5-5|共1页
  • 作者

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号